Figure B.76 ADS-B Traffic On-Ground - Along-Track (X-Axis) Total Position Er-ror Uncertainty (99.9%) as a Function of Latency Compensation Threshold[True Traffic Speed of 10 knots]3 curves in each plot represent Velocity Accuracies (95%) of 10 m/s, 3 m/s, and 1 m/s.
|