用户名: 密码: 登 录   个人中心   系统维护   用户注册  联系我们
当前位置 >首页 > 标准信息

全文阅读 全文下载 章节阅读

基本信息

AMS2647D
Fluorescent Penetrant Inspection Aircraft and Engine Component Maintenance
Fluorescent Penetrant Inspection Aircraft and Engine Component Maintenance
2011-03-01
有效
【范围】 1.1 Purpose This specification details requirements and procedures for the detection of defects in aircraft and engine components during maintenance and overhaul operations. 1.1.1 This specification contains three appendices which provide additional guidance designed to supplement the information contained in the main body of the document. Because the guidance contained in the appendices is either subjective in nature or may have alternative acceptable approaches, it is not intended to be binding unless specifically invoked by the cognizant engineering organization (CEO), an original equipment manufacturer (OEM), or other contractual agreement. Personnel performing inspections to this specification should be familiar with the guidance and exercise good judgment if variance from this guidance is necessary. The following appendices are included: 1.1.1.1 Appendix A - Guidelines for Design, Procurement and/or Fabrication of Penetrant Systems 1.1.1.2 Appendix B - Guidelines for Assessment of Background Fluorescence 1.1.1.3 Appendix C - Processing and Inspection of Drum Rotors/Deep Well Spools and Other Complex Parts w/Limited Accessibility 1.2 Processing of parts and interpretation and evaluation of indications revealed by this inspection process shall be accomplished by qualified personnel having experience with fluorescent penetrant inspection. Qualification of personnel shall be in accordance with ATA 105, MIL-STD-410, NAS 410, EN 4179, or ASNT SNT-TC-1A. 1.3 Basis of Application This process has been used typically by maintenance and overhaul facilities to inspect aircraft and engine components and associated accessories when fluorescent penetrant inspection is specified, but usage is not limited to such applications. 1.3.1 There are areas in this document that may require specific direction from the OEM or CEO. This direction shall be provided in the part material specification for each part (See 7.2.48) in the following areas: 1.3.1.1 Etching Requirements If not specified, etching will not be performed (See 3.3.6). 1.3.1.2 Cleaning Requirements If not specified, solvent cleaning using Alcohol, Acetone or Methyl Ethyl Ketone (where locally approved) (See 3.4) or an approved QPL-AMS-2644 solvent cleaner/remover is acceptable. 1.3.1.3 Surface Coating Removal If not specified, parts may be inspected with the surface coating intact (See 3.3.4 and 3.3.4.1). 1.3.1.4 Penetrant Sensitivity Level If not specified, Sensitivity Level 3 penetrants shall be used on all airframe hardware and components and Sensitivity Level 4 penetrants shall be used on all Major Rotating components of engines and Auxiliary Power Units (See 7.2.29). 1.3.1.5 Penetrant Method If not specified, Type I, Methods A, C, or D may be used except for major rotating engine hardware which shall only be inspected using Type I, Methods C or D. 1.3.1.6 Drying If not specified, air-circulating oven drying shall be used. If other heat-assisted drying methods are used, they shall be approved by the CEO. 1.3.1.7 Developer If not specified, dry developer (form a) shall be used. 1.3.1.8 Inspection Coverage If not specified, the areas described in 3.4.12.1 shall be inspected. If inspection of areas requiring special equipment or techniques (i.e., UV borescopes or light sources, special material application or removal devices, part handling fixtures, part masking, etc.) is necessary, detailed instructions shall be provided by the OEM part or material specification. When specific areas of parts require intensified inspection scrutiny, due to either their critical nature or past history of failure, this information shall be included in the repair or inspection manual or document. 1.3.1.9 Post-Inspection Cleaning If not specified, parts shall be cleaned and dried after inspection to remove inspection residue which may be detrimental to subsequent operations or impair the structural or functional integrity of the part. 1.3.1.10 Processing Parameters Shall be as specified within this document. If approved by the OEM, different processing parameters, other than those specified herein, may be used. 1.3.1.11 Acceptance Criteria This specification does not provide accept/reject criteria for specific components. Where no accept/reject criteria are specified by the CEO, all relevant indications shall be regarded as suspect and shall not be accepted without review by the CEO. 1.4 Classification of Penetrant Systems 1.4.1 Applicable fluorescent penetrant systems are classified into the following Types, Methods, and Sensitivity Levels: Type I - Fluorescent dye Type II - Visible Dye (not applicable to this specification) Method A: Water-Washable Method B: Post-Emulsifiable, Lipophilic Method C: Solvent Removable Method D: Post-Emulsifiable, Hydrophilic Sensitivity Level 2: Medium Sensitivity Level 3: High Sensitivity Level 4: Ultra-high 1.4.2 Applicable developers are classified into four forms. Form a Dry Powder Developer Form b Aqueous Soluble Developer Form c Aqueous Suspendable Developer Form d Nonaqueous Wet Developer (NAWD) 1.5 Safety - Hazardous Materials While the materials, methods, applications, and processes described or referenced in this specification may involve the use of hazardous materials, this specification does not address the hazards which may be involved in such use. It is the sole responsibility of the user to ensure familiarity with the safe and proper use of any hazardous materials and to take necessary precautionary measures to ensure the health and safety of all personnel involved. 1.5.1 Safety Precautions Protective clothing, including eye shields, suitable gloves, and aprons should be worn when filling tanks or when there is a possibility of splashing or overspray. Tanks should be covered when not in use and should be operated with adequate ventilation for fume extraction. Operating instructions from the manufacturer of the system employed together with local workshop regulations shall be followed.strRefField
【与前一版的变化】

替代标准

引用文件/被引文件

Inspection Material
Clarification of Terms Used in Aerospace Metals Specifications
Standard Practice for Liquid Penetrant Testing
Standard Test Method for Comparing the Brightness of Fluorescent Penetrants
Standard Guide for Use of UV-A and Visible Light Sources and Meters used in the Liquid Penetrant and Magnetic Particle Methods
Nondestructive Testing Personnel Qualification and Certification
Inspection Material
Guidelines for Training/Qualifying Personnel in Non-Destructive Testing Methods
Certification and Qualification of Nondestructive Test Personnel
Recommended Practice for Personnel Qualification in Nondestructive Testing
Qualification and approval of personnel for non-destructive testing

包含图表

WATER WASHABLE PENET
POST-EMULSIFIABLE (L
SOLVENT REMOVABLE PE
POST-EMULSIFIABLE (H
PANEL INDICATION SIZ
TABLE 2
ILLUSTRATION OF THE
SKETCH OF VIEWING SY
BORESCOPE RESOLUTION
BORESCOPE RESOLUTION

标准反馈


  • 问题类型:
    反    馈: