基本信息

AS4112
PRODUCTION TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS REMOTE TERMINALS
PRODUCTION TEST PLAN FOR THE DIGITAL TIME DIVISION COMMAND/RESPONSE MULTIPLEX DATA BUS REMOTE TERMINALS
2011-11-01
有效
【范围】 This test plan is broken into two major sections for the production testing of remote terminals: Electrical and Protocol. 1.1 General: This production test plan defines the test requirements for verifying that Remote Terminals meet the requirements of MIL-STD-1553B, "Digital Time Division Command/Response Multiplex Data Bus." 1.2 Application: This is a general test plan for any remote terminal designed to meet the requirements of MIL-STD-1553B. These requirements shall apply to the remote terminal under test, when invoked in a specification or statement of work. Tests specified may be performed in any order, combined with one another or combined with other tests of the subsystem in which the Remote Terminal may be embedded. The Remote Terminal which is under test must also have its design validated per the "Validation Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Remote Terminals." The tests specified are to be used in production test of a remote terminal chip, module or function within an equipment. It is intended that all stimuli and measurements be made via external connections and/or test points. No required access to any other points is intended. Special requirements such as those needed to meet armament bus requirements when specified in the individual equipment specification may, when within 1553B requirements, replace values or tolerances specified in this test plan for the purpose of generating a UUT production test procedure.strRefField
【与前一版的变化】

被引文件

Validation Methods For MIL-STD-1760D Mission Stores
Digital Time Division Command/Response M ultiplex Data Bus
Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Bus Monitors
Validation Methods For MIL-STD-1760D Mission Stores
Digital Time Division Command/Response M ultiplex Data Bus
Test Plan for the Digital Time Division Command/Response Multiplex Data Bus Bus Monitors

相关标准

A Guide for the Selection of Quick-Disconnect Couplings for Aerospace Fluid Systems
BAROMETRY FOR ALTIMETER CALIBRATION
Numeral, Letter and Symbol Dimensions for Aircraft Instrument Displays
Bibliography of References Pertaining to The Effects of Oxygen on Ignition and Combustion of Materials
Performance of Low Pressure Ratio Ejectors for Engine Nacelle Cooling
(R) Control of Water Carryover from the Environmental Control System and Condensation on the Structure
Construction and Calibration of Parallel Plate Transmission Line for Electromagnetic Interference Susceptibility Testing
Anti Blow-By Design Practice for Cap Seals
Airline Tow Tractor - Baggage/Cargo Factors for Design Consideration
Cushion Tow Hitches Test

包含图表

Error Formats
General Test Configu
Optional Test Config
Waveform Measurement
Zero Crossing Interv
Output Noise Configu
RT-RT Timeout Measur
Gap Time Measurement